BKO Biomass Power Plant Otelfingen

BKO Biomass Power Plant Otelfingen

Power station buildings · Otelfingen ZH · 2011
© losys
Verified reference This project was carefully researched and compiled by Losys GmbH.
A new biomass power plant is being built here in Otelfingen.
Plant type: Grate furnace with 3-pass water tube boiler and condensing turbine
Fuel requirement: 30,000 t/a wood chips from uncontaminated waste wood
Electrical power: 2.6 MW
Electricity production: 18 million kWh/a. Corresponds to the consumption of over 5,000 households
Investment: 24 million CHF
Commissioning: November 2011
© losys

Other companies involved

Architect · Otelfingen ·
Private Project Owner · Otelfingen ·
Building services planning, General Planner · Basel ·
General Planner · Kloten ·
District heating · Waldkirch ·
Building cleaning · Dietikon ·
EMSR technology, MSR implementation · Wilchingen ·
Construction partner · Bern ·
Deconstruction · Weinfelden ·
Electrical planning, MSR planner · Basel ·
Electrical installations · Wettingen ·
Piping, Reserve control center · Baden ·
Residual waste logistics · Rubigen ·
Cooling system · Fürstenfeldbruck ·
Capacitor · Geesthacht ·
Carpentry work · Buchs ·
Painting work, Plastering work · Dänikon ·
Construction partner · Otelfingen ·
Container · Hinterkappelen ·
Structural works · Dietikon ·
Heat distribution · Wallisellen ·
Carpentry · Otelfingen ·
Leak monitoring system · Würenlingen ·
Surveying · Dielsdorf ·
Steel construction · Dällikon ·
Locking system · Zürich ·
Project management · Bern ·
HVAC and sanitary planning · Gelterkinden ·
Boiler system · Emmendingen ·

Is your company missing here?

List your involvement for free — with your logo and a link to your company profile.

Location

Loading map …
The map could not be loaded.