New Construction and Redesign of Bahnhofplatz Süd
The bus lanes of Stadtbus will be newly concreted, and black asphalt will be installed in the waiting areas and walkways. The new square will be deliberately furnished sparingly to accommodate the steadily increasing pedestrian flows.
- Construction of temporary bus stops
- Removal of overhead lines and poles, old roofs and furniture
- Construction of excavation closures
- Excavation up to seven meters deep
- Concrete work partial section Zulaufkanal Schützenwiese
- Foundation for new roof structure
- Conversion of pedestrian underpass
- New construction of Stadtbus rest areas in the basement
- Scaffolding for steel structure roof
- Steel structure roof including glass profiles, corrosion protection and facade cladding with aluminum perforated sheets
- New construction of bus waiting halls on the Untertor side
- Concrete slabs in bus lanes
- Black asphalt on walkways, furnishings and lighting
Construction begins in July 2012 and ends in June 2013.