bau-referenzen.ch
Collège Mars - renovation, raised construction and energy retrofit

Collège Mars - renovation, raised construction and energy retrofit

Public buildings · Ecublens VD · 2026
© losys
Verified reference This project was carefully researched and compiled by Losys GmbH.
Projects Collège Mars - renovation, raised construction and energy retrofit
Generating PDF … Download PDF
Collège Mars in Ecublens is undergoing complete renovation, including a raised construction and an extension. The new ventilated façades will be clad with ceramic stoneware and metal, offering contemporary aesthetics while improving the building's energy efficiency. Designed according to the SméO Environnement label standards, the project aims for high environmental performance.
© losys
© losys
© losys
© losys
© losys
© losys

Other companies involved

Architect · Vevey ·
Project owner 2 · Ecublens ·
Site Management · Carouge GE ·
Elevator systems · Bussigny-près-Lausanne ·
Frame · St-Légier-La Chiésaz ·
Civil Engineer · Aigle ·
Electrical Engineer · Eclépens ·
Façade engineer · Burgdorf ·
Heating/Ventilation Engineer · Lausanne ·
Ventilation installations · Bussigny ·
Sanitary engineer · Echallens ·
Painting work, Plastering work · Ecublens VD ·
Scaffolding · Ecublens ·
Acoustics · Lausanne ·
Building Physics · Lausanne ·
Tiling works · Prilly ·
Fire protection engineer 2 · Montreux ·
Surveyor · Chexbres ·
Sealing work, Sheet metal work 2 · Echandens ·
Masonry · Poliez-Pittet ·
Electrical installations · Le Mont-sur-Lausanne ·
PVC floor coverings · Lausanne ·
Wooden interior doors · Palézieux-Village ·
Demolition work · Bioley-Orjulaz ·
Facades · Givisiez ·
Sanitary installations 2 · Le Mont-sur-Lausanne ·
Heating installations · Rossens ·

Is your company missing here?

List your involvement for free — with your logo and a link to your company profile.

Location

Loading map …
The map could not be loaded.