bau-referenzen.ch
New Campus T Development, Phase 1

New Campus T Development, Phase 1

Public buildings · Winterthur ZH · 2030
© losys
Verified reference This project was carefully researched and compiled by Losys GmbH.
Projects New Campus T Development, Phase 1
Generating PDF … Download PDF
The new Campus T development comprises two state-of-the-art laboratory buildings and a connecting park along the Eulach. Precise architecture, flexible laboratory clusters and integrated flood protection technology create a future-proof infrastructure for research and teaching. The structural framework, landscape and technical systems are designed with functional clarity and enable efficient process-oriented workflows for modern engineering sciences at the Winterthur location.
© losys

Other companies involved

Overall Management, General Planner · Zürich ·
Client Representative · Zürich ·
Overall Management, General Planner · Zürich ·
Demolition work, Civil engineering · Winterthur
Structural works · Thalwil ·
Lighting planning · Aldrans / Innsbruck ·
Explosion protection, Object protection assessment · Esslingen ·
Steel construction · Rheineck ·
Fire protection planner · Dübendorf ·
Pollutant remediation · Zürich ·
Acoustics + building physics, Sustainability · Zürich ·
Crane systems · Schötz ·
Facade planner · Aadorf ·
Glass-metal facade · Courtételle ·
Electrical planning · Winterthur ·
HVAC and sanitary planner · Zürich ·
Landscape architecture · Winterthur ·
Laboratory planner · Gelterkinden ·
Hydraulic engineering · Winterthur ·
Transformer station · Islikon ·
Gastronomy planning · Zürich ·
Scientific apparatus specialist · Basel ·
Elevator systems 2 · Embrach ·
Structural engineer 2, Bridge construction planning · Zürich ·
Hydraulic engineer · Zürich ·
Sewerage, Utility lines · Winterthur ·
User representation · Winterthur ·

Is your company missing here?

List your involvement for free — with your logo and a link to your company profile.

Location

Loading map …
The map could not be loaded.