bau-referenzen.ch
Europaallee EA21, Building Field C40

Europaallee EA21, Building Field C40

Commercial buildings · Zurich ZH · 2012
© 2178-k. studer ag
Verified reference This project was carefully researched and compiled by Losys GmbH.
The urban planning concept provides for an ensemble of four building sections that are interlocked like mill wings and form a common organizational system. The buildings are each separated from one another by a gate to the courtyard, but at the same time connected by continuous structural elements above. The entrance lobbies fit into a coherent system of access routes and passages between street and courtyard. On the first floor, there is a gallery that connects the four buildings around the courtyard and forms a circulation ring for the entire ensemble. At the top, the buildings are articulated into differentiated building volumes through roof terraces and recesses at the courtyard gates.
© 2178-k. studer ag
© 2178-k. studer ag
© 2178-k. studer ag
© 2178-k. studer ag
© 2178-k. studer ag

Is your company missing here?

List your involvement for free — with your logo and a link to your company profile.

Location

Loading map …
The map could not be loaded.