University of Zurich Irchel 4th Construction Stage, Buildings 15, 35 and 55
of 22kV. The total annual energy consumption including parking garage and sports facilities is 22GWh. Of this,
1.5GWh is attributable to the fourth stage.
Emergency power supply is provided by 7 diesel systems with a total capacity of 2.2MW. In the fourth stage,
another system with two engines of 300kW each was installed. One of these engines was configured as a combined heat and power plant.