University of Zurich Irchel 4th Construction Stage, Buildings 15, 35 and 55

University of Zurich Irchel 4th Construction Stage, Buildings 15, 35 and 55

Public buildings · Zurich ZH · 1999
© unbekannt
Verified reference This project was carefully researched and compiled by Losys GmbH.
Projects University of Zurich Irchel 4th Construction Stage, Buildings 15, 35 and 55
Generating PDF … Download PDF
Energy supply for the University Irchel is provided via 8 transformer stations from the EWZ medium-voltage network
of 22kV. The total annual energy consumption including parking garage and sports facilities is 22GWh. Of this,
1.5GWh is attributable to the fourth stage.
Emergency power supply is provided by 7 diesel systems with a total capacity of 2.2MW. In the fourth stage,
another system with two engines of 300kW each was installed. One of these engines was configured as a combined heat and power plant.
© unbekannt

Other companies involved

Total Contractor · Glattpark (Opfikon) ·
Public Project Owner · Zürich ·
Architect · Zürich ·
Electrical planning · Zürich
Civil Engineer · Affoltern am Albis ·
Heating, cooling · Zürich ·
Ventilation engineer · Dietlikon ·
Sanitary planning · Kollbrunn ·