Here in Aarau, the Rüchlig power plant is being renovated.
Existing facility:
Energy production 55 GWh
Capacity approx. 10 MW
Design water discharge 340 cubic meters per second
Gross head 3.3 to 3.5 meters
New facility:
Energy production 63 GWh
Capacity approx. 11 MW
Design water discharge 400 cubic meters per second
Gross head 3.3 to 3.4 meters
Planned schedule:
Public consultation Oct./Nov. 2010
Concession grant Canton Aargau Summer 2011
Construction start Oct. 2011
Commissioning main power plant Jan. 2015
Commissioning compensation power plant Nov. 2014
Select the images for which you would like to purchase usage rights.
All prices in CHF, excl. VAT.
Your choice regarding advertising cookies
We use cookies and comparable technologies from our advertising partners to measure the effectiveness of our advertising. This processing only takes place with your consent; you may withdraw it at any time. You can see which services these are under “Settings”. Audience measurement for our own website is anonymous and works without cookies. Details in our privacy policy.
Necessary
Required to operate the website (e.g. your language choice). Always active.
Meta Pixel: measures the performance of our ads on Facebook and Instagram. Data is transmitted to Meta Platforms Ireland Ltd. and transferred to the USA.
LinkedIn Insight Tag: measures the performance of our ads on LinkedIn. Data is transmitted to LinkedIn Ireland Unlimited Company and transferred to the USA.